freight connection group

Project Cargo Services

We believe in offering customer centric services to meet higher level of their satisfaction. Our team is highly dedicated and skilled to perform large projects that need expert coordination movement of overweight and high-value cargo.
We show special care and proficiency in project cargo and turnkey logistics such as fragile equipment which needs distinguished preparation for shipping.
FCPPL thrives in markets that offer challenges such as political instability, security, and poor transport structure.
We do three types of Project Logistics

Project Logistics Management
Extreme Project solution
Tailored logistics solution

Project Experiences

Handling Hot Operation of Bitumen

Role of Freight Connection Pakistan
Right from the arrival at Karachi Port Trust (KPT) and final destination to Shujabad, Punjab i-e , Freight Connection Pakistan handled the project which was a real challenge, our scope was not limited to transport but vessel handling agency, custom clearance, taking direct delivery of bitumen in the specialized Bitutainers & tank lorries from bulk vessel at the temperature of 150 degree centigrade and transport to site at the same temperature.The total journey is about 875 KM with special NHA permissions to transport such hot cargo.
Our dedicated Project team has made it possible by working 24/7 at KPT while discharging cargo from vessel to Bitutainers/Tank Lorries, made all Customs clearance arrangements in advance and arranged permissions from National Highway Authority for timely and smooth delivery. Actively coordinated with all port authorities for timely berthing of vessel and made special arrangement at berth for discharging the bitumen directly in Bitutainers.

PASSENGER BOARDING BRIDGE STRUCTURES AND ASSEMBLY COMPONENTS FOR THE PESHAWAR AIRPORT, PAKISTAN

Role of Freight Connection Pakistan
Right from Barcelona Spain Port to SAPT- Pakistan and final destination to Peshawar International Airport, Freight Connection Pakistan handled the project, which was a real challenge delivering such a complex & fragile cargo of high quality Passenger Boarding Bridges with two or three bodies, a hydraulic / electromechanical elevation system, glass / steel tunnels and an increasing or decreasing telescope extension and other assembly components. The total journey was 1400 KM with special permissions.

Our dedicated Project team has made it possible by working 24/7 at SAPT while unloading cargo from vessel to Semi Bed, Low Bed trailers, made all Customs clearance arrangements in advance and arranged permissions from National Highway Authority for timely and smooth delivery. Actively coordinated with Pakistan Civil Aviation Authority -PCAA and consignee to deliver the cargo on their given date and time.

The task was finished within the given timeline with a highly-satisfied customer receiving our devoted “One Window” service.
Project Details
472 cbm with 2 Passenger Boarding Bridges
02×40’ HC & 01×40’ OT containers

1320MW PROJECT OF HUBCO POWER STATION, BALUCHISTAN

Role of Freight Connection Pakistan
Right from Karachi Port till final destination to HUBCO Power Station, Freight Connection Pakistan handled the project, which was a real challenge delivering such a complex cargo of high quality construction material and Equipment of Plant & Machinery.

Our Scope of work includes complete handling from arrival at Karachi Port till final delivery to the job site, approximate distance from Karachi till Job Site is 56KM. The cargo is structures and assembly components of 1320 MW HUBCO Power Plant Project.

SAHIWAL COAL FIRE POWER PLANT (RE-EXPORT SHIPMENT)

About Project
Freight Connection Group is performed another special project covering complete handling that includes transportation from Sahiwal to Karachi Port Trust, custom clearance, and delivery under hook.
Role of Freight Connection Group (FCG)
Right from Sahiwal, to Karachi Port Trust, FCG is handling the project, which is a real challenge delivering such a complex cargo and that too within the given time period assigned to it.
Delivery under hook is done using the state-of-the-art equipment’s, provided by the vessel. Custom clearance is being done within 48 hours.
We at FCG excel in transporting the cargo within the given period of time. We have proudly set a milestone to deliver the cargo on arrival of the vessel without any display.
Our dedicated Project team has made it possible by working 24/7 at sit and port while loading and delivering the cargo to vessel, beside this the custom clearance arrangements was done in advance for timely and smooth delivery.
Our project team was hence appreciated for their dedication in putting all the efforts for giving their best, in order to make the project a success.
Project Details
Project includes 68 units, inclusive of 10 cranes with its accessories.

MRTS ORANGE LINE METRO TRAIN PROJECT

About Project
Freight Connection Group is recently performing another special project covering complete handling that includes un-loading cargo, custom clearance and transportation for the modules of Orange-Line Metro buses.
Role of Freight Connection Group (FCG)
Right from China, to different ports in Karachi and final destination to Lahore, FCG is handling the project, which is a real challenge delivering such a complex cargo and that too within the given time period assigned to it.
Unloading is done using the state-of-the-art equipment’s that includes cranes, lifters, jack trollies. Custom clearance is being done within 48-70 hours.
We at FCG excel in transporting the cargo within the given period of time. We have proudly set a milestone of transporting 50 containers in a day.
Our dedicated Project team has made it possible by working 24/7 at different ports while unloading cargo, doing all the custom clearance arrangements in advance for timely and smooth delivery.
We at FCG further strive in concluding the project within the time period assigned.
Project Details
Approximately 2000 containers out of which 800 containers are being transported to the destination, safely.

Re-Export of 120 tons Flat Wall Hanging Crane & 50 Tons Mobile Crane Sahiwaal 02×660 Coal Fired Power Project

FCPPL has been awarded this project to provide logistics services to Re-export 120 tons Flat Wall Hanging & Mobile Crane from Jobsite Sahiwaal, Pakistan to Shanghai, China which was imported by FCPPL under temporary Import.
Our scope was not only limited to Ocean Freight but conducting Cargo survey, Arranging and loading of Crane parts on trailers, Transporting from job site to Karachi warehouse. We have completed the loading at site in 1 day and brought the cargo to Karachi in 3 days which is about 800 km towards Karachi. All roads permits were obtained during transit for the heavy package.

Project Details:

Origin: Sahiwaal Coal Fired Power Plant
POL: Karachi Port
POD: Shanghai, China

Volume:

No. Of units: 177
Total Cbm: 1753
Heaviest Unit: 42 tons

Freight Connection Pakistan has awarded this project to provide total logistic services from point of origin Shanghai- China to point of destination HUB power plant- Baluchistan- Pakistan

Project Details:

Our scope of services was not limited to transport but the loading at Port and custom clearance was also under our scope of services.

Details are mentioned below:

POL: Shanghai
POD: Karachi Port Trust (KPT)
Final Destination: HUB Power Plant
Number of Units: 8 (6 Concrete Mixer Truck & 2 Concrete Pump Truck)
Total Distance: 55 kms from Karachi Port to HUB Power plant
Heaviest Unit: 34 tons with the height of 13 feet’s

 

Kuch Khaas (Exhibition Logistics)

frieght

Move One Pakistan team, who are highly skilled in Relocation & Packing Business,has been given a task to Pack & Transport Artwork which includes Paintings & sculptures of Famous artists. Considering nature of fragile Cargo, our team of expert packers, did the packing job by meeting the desired requirements and prepared it to road-worthiness and safe handling during loading and unloading;this includes special wood crating for safe delivery.
A dedicated vehicle was used for transportation of artwork from Karachi & Lahore to Islamabad. Pre arrangement to enter vehicle in red zone, taking all permissions from concerning authorities; A Professional team was dedicated to handle final delivery to Us Embassy in Islamabad which included unload and unpack the Artwork. The scope also covered to safely bring the Artwork back to its origin.
Move One Team Has successfully delivered the Artwork within the shortest deadline.

 

Passenger boarding bridges structures and assembly components for the Jinnah International Airport – Karachi

Project Details:

Freight Connection Pakistan Pvt. Ltd has recently experienced another special Project covering complete handling from Vessel agency till final delivery of very delicate Passenger boarding bridges (PBBs) structures and assembly components for Karachi International Airport.

Right from Tarragona, Spain Port to Port Qasim- Pakistan and final destination to Karachi International Airport, Freight Connection Pakistan has remarkably handled the project, which was a real challenge delivering such a complex & Fragile cargo of High quality Passenger Boarding Bridges with two or three bodies, a hydraulic / electromechanical elevation system, glass / steel tunnels and an increasing or decreasing telescope extension and other assembly components.

Previously in phase I, there was a cargo of around 3900 cbm with 16 passenger and other components of boarding bridges for Domestic Apron. In phase II there was a cargo of approx 6500 cbm with 18 Passenger Boarding Bridges along with 21 SOC container and other components for International Apron.

Our dedicated Project team has made it possible by giving 24/7 at Port Qasim while unloading cargo from vessel to Semi Bed, Low Bed, Extendable & Multiaxl trailers, made all Customs clearance arrangement in advance for timely and smooth delivery. Actively Coordinated with Pakistan Civil Aviation Authority -PCAA and consignee to deliver the cargo on their given date and time.

The task was finished with in the given timeline & Customer is highly satisfied with the provided devoted One window services.

 

Re-export of 450 tons Crawler Crane Sahiwaal 02×660 Coal Fired Power Project

Project Details:

Origin: – Sahiwal 02×660 Coal Fired Power Project
POL: KPT(Karachi Port Trust)
POD: Xingang, China
Total Cbm: 1935
Total weight: 750 tons
Number of Packages: 85 Units
Heaviest Package: 60 MT

 

Import of Crawler Crane- Capacity 630 Tons

Our scope of services was not only limited to Transportation but the following.
• On-board & Discharging Survey of the cargo
• Under hook delivery of heavy packages
• Custom Clearance
• Loading of the cargo at Port
• Transportation from Karachi Port to Bhikki Power Plant.

Project Details:

• Begining from Port of Tianjin, China
• Discharging at Karachi Port Trust
• Final Destination: Bhikki Power Plant, Punjab

 

Freight Connection Pakistan has become a part of the first pilot trade cargo commercial activity from Gawadar port under (CPEC) China Pakistan Economic Corridor“One Belt One Road”

On 29th October 2016 the trade convoy of 95 containers departed from Kashgar (Western China) and entered on 30th Oct into Pakistan at Kunjerb pass. The convoy arrived at Gawadar port on 12th November via Western route. Another convoy of 66 containers from Lahore (Pakistan) arrived at Gawadar port via eastern route. The Chinese origin containers were loaded on Chinese vessel name Cosco Wellingtonand Pakistan origin containers were loaded on Pakistani vessel nameAl Hussein. The containers were loaded on the ships destine for Middle East and Africa from Gawadar port.

Vessel Al Hussein was chartered by Freight Connection Pakistan (Private) Limited to load the containers at Gawadar port. The containers were transported from Lahore via Eastern CPEC route.

CPEC (China Pakistan Economic Corridor) is a revival of ancient silk route connecting East and West with the shortest land and sea route to the Middle East, Africa, Central Islamic States and Europe;the trade starts from the cold mountainous regions of Himalaya to the warmerArabian Sea at Gawadar. The overall cost of CPEC project worth46 billion US dollars will benefit Pakistan, China, Iran, Afghanistan, Middle East, Africa& Central Asian States.

Freight Connection Pakistan was selected as the company to arrange the ship, containers and transport them for the commencement of trade activity at Gawadar Port. It is a milestone for FCPPL being a part of Gawadarfirst mega trade convoy.

The ceremony was inaugurated by the Prime Minister of Pakistan Mian Muhammad Nawaz Sharif along with the Chief of Army Staff General Raheel Sharif. The ceremony was attended by prestigious delegates from China and many other foreign country ambassadors, foreign dignitaries, cabinet ministers and senior Pakistan army officials.

PESHAWAR-KARACHI MOTORWAY SECTION- 5: TARANDA-KHAN BELA SECTION

Freight Connection Pakistan Pvt. Ltd is determined with the growth in project cargo and achieved another milestone with the collaboration of M/s Ryan Agency by providing complete services from arrival at Karachi port to the final delivery of construction Machinery to Taranda & Khan Bela Punjab.

Our team completed the Customs formalities within 48 hours from the date of arrival and arranged shifting the cargo to parking/storage area at the port for gate out process.
The journey was about 800 kms to Khan Bela and Tarranda, our plan was to move everything in one convoy. All road permits were obtained by the team well in advance to avoid any delays on route. Our team sourced qualified drivers for the 50+ heavy vehicles/dumpers that were driven, with the remainder of the cargo loaded by 100-ton crane onto flat and low-bed trailers. The entire movement from Karachi Port to Khan Bela & Taranda was completed in 48 hours.

Freight Connection Pakistan Handles Heavy Construction Machinery Project: PESHAWAR-KARACHI MOTORWAY SECTION-II: SUKKUR-MULTAN SECTION- 2016

Freight Connection Pakistan Pvt Ltd, has completed another project with the collaboration of M/s Ryan Agency by providing complete services to move of heavy construction machinery from Tianjin Port of loading via Ro/Ro vessel to arrival at Karachi port and through to final delivery to Multan, Pakistan.

Freight Connection’s project team completed the Customs formalities, then arranged shifting the cargo to parking/storage areas at the port. Our team was present on ground 24/7 both at the port and at the destination site to supervise the movement. Our team shared live information with the customer on spot throughout the project.

The road journey was 930 kms to Multan and our plan was to move everything in one convoy. All road permits were obtained by the team well in advance to avoid any delays on route. Our team sourced qualified drivers for the 70+ heavy vehicles that were driven, with the remainder of the cargo loaded by 100-ton crane onto flat and low-bed trailers. The entire movement from Karachi Port to Multan was completed in 48 hours.

80 Packages – inclusive of the following
40 Dump Truck
4 Sprinkler Truck
1 Tank Truck
1 Crane
4 Bull Dozers
2 Graders
2 Tractor Heads
2 Low bed Semi-trailers
4 Excavators
10 wheel Loaders
3 Road Rollers, 6 Gensets & 1 drilling Rig

Handled Cooling Van (Air Conditioning Unit) which uses to Cool down the Air craft temperature, Successfully moved from Belgium to Port Qasim, Pakistan

Freight Connection Pakistan pleased to share yet another remarkable Project experience covering complete handling from door to port of Air Conditioning Unit.
Our Project Team has remarkably handled the project from Factory to Port Antwerp, Belgium by road and then Port Antwerp, Belgium to QICT by sea, which was a real challenge delivering such a complex cargo of Hhigh quality Air Conditioning Unit.
Our dedicated Project team has made it possible by giving their presence at Port Qasim while unloading cargo from vessel to ensure safety & security of the cargo.
The task was finished with in the given timeline & Customer is highly satisfied with the provided devoted services

PASSENGER BOARDING BRIDGES STRUCTURES AND ASSEMBLY COMPONENTS FOR THE KARACHI JINNAH INTERNATIONAL AIRPORT

Freight Connection Pakistan pleased to share one of the prodigious Project experience covering complete handling from Vessel agency till final delivery of Passenger boarding bridges (PBBs) structures and assembly components.

Right from Tarragona, Spain Port to Port Qasim- Pakistan and final destination to Karachi International Airport, Freight Connection Pakistan has remarkably handled the project, which was a real challenge delivering such a complex cargo of High quality Passenger Boarding Bridges with two or three bodies, a hydraulic / electromechanical elevation system, glass / steel tunnels and an increasing or decreasing telescope extension and other assembly components.

Our dedicated Project team has made it possible by giving 24/7 at Port Qasim while unloading cargo from vessel to Semi Bed, Low Bed, Extendable & Multiaxl trailers, made all Customs clearance arrangement in advance for timely and smooth delivery. Actively Coordinated with Pakistan Civil Aviation Authority -PCAA to deliver the cargo on their given date and time.
The task was finished with in the given timeline & Customer is highly satisfied with the provided devoted One window services.

Freight Connection Pakistan Handled importation of Break Bulk Vessel Charter & Movement of Crawler Crane up to 59 Tons & Bridge Crane up to 60 Tons from Shanghai – China to Karachi Port till Sahiwaal- Punjab

Freight onnection Pakistan Pvt Ltd, a WCA and
XLP Project member in Pakistan, was recently
awarded the heavy lift project to transport a
Crawler Crane up to 59 Tons & Bridge Crane
up to 60 Tons,this co nsignment is intended to
industrial use imported from the origin site–
Shanghai in China and transported to the
destination job site a t Sahiwaal, Pakistan.
Cargo reached at KPT,where we have arranged
direct hook delivery and moved towards final
destination. We have managed the full origin
services including the vessel chartering,inward
customs clearance and delivery to site.
Our customer is highly satisfied and appreciated
our services.

Project Details
1 Crawler Crane 59 Metric Tons
1 Bridge Crane 60 Metric Tons

 

Heavy Weight Boiler- Project


Freight Connection Pakistan has awarded this project by SES Engineering Works to provide total logistics services from point of origin Felixstowe – UK to point of destination Lahore- Punjab- Pakistan

FCPPL has made special arrangements for the handling of this cargo at Port Of discharge, which includes Allow from customs to take direct delivery on low bed trailer from vessel, Custom Clearance & Transportation from QICT to Lahore Dry port.

Project Details
3 x Break Bulk Used wetback smoke tube boiler- (Weight 180000 KG)
1×40 Flat Racks
Used wetback smoke tube boiler- (Weight 20000 KG)
2×40 HC Containers
Used Machinery & Parts (Weight 20000 KG)

Break Bulk Vessel Chartering
Transformer & Accesories to Quaid-e-Azam Solar Park-2015


Freight Connection Pakistan has got opportunity to provide total logistics services to project owner Zonergy Company Ltd. from point of origin China -to point of destination Quaid-e-Azam Solar Park in Bahawalpur through vessel chartering.

Project Details
01 Main Transformer carrying weight up to 75 Metric Ton
09 Oil Tanks
14 Packages Transformer Accessories

Zonergy/ZTE 100 MW – Bhawalpur SOLAR Power Project – 2015

Freight Connection Pakistan completed first Phase of 50MW for the world biggest solar park.

Volume detail
By Ocean: 13 shipments (Total 503 Units)
By Air: 10 shipments (Total 262 Packages and 1 Main body Transformer carrying weight up to 75 tons)

UN (United Nations) Cargo – Peace Mission Via Pak Army 2015

Freight Connection Pakistan has provided Door to Door service from point of origin to point of destination (Khi to Central African Republic).
Volume detail
Total: 222 TUES
67×20’
155 units (95 vehicle , 11 trailers & 49 Break Bulk)
Total CMB 9219 but report to UN 8407

Pak Army – (Remodeling Brass Factory) 2015

Freight Connection Pakistan is providing Ocean freight
& local transportation services, Export Czech Republic to KHI (Port Qasim) and transport to Islamabad.

TUES Handling details

40×40’ +2x40FR
36×40’ + 2x40FR
32×40’
28×40’
1×40’
1×20’ (SOC)

Total Tues handle till March 2015 : 283 TEUS

US / NATO Support (South Park) – 2015

Freight Connection Pakistan is providing transportation services from Kandahar to Karachi port & Ocean freight from Karachi to Jebel Ali.
The current volume being handled is approximately totaling 67 units, 36 units are relatively containers (out of which 34 are solely 40 ft and 2 are 20 ft); the remaining 31 units are lose cargo (break bulk cargo)

Local Airline PIA – 2014

(Local Air freight project from Boeing US – Pakistan (Cargo plane charter).
Commodity : PW152-3 Engine
(7100KG) 1 Unit

SDDC Project (Military Surface Deployment & Distribution Command) Year 2013- 2012:

Freight Connection Pakistan provided transportation services to SDDC from Afghanistan to Karachi. The volume being handled was approximately 72 Units.

TF Falcon/TF Shooter/Retrograde 19 – Projects (Year 2011):

Freight Connection Pakistan provided transportation services from Afghanistan to Karachi.
The volume being handled was more than 400 Units.

Latest News

left-btn
right